Things tagged 'london'

limited to the area of Southwark Cyclists:

6 issues found for 'london':

  • Wapping Liveable Streets engagement

    Created by Alex Jenkins // 1 thread

    From the consultation website:
    https://www.pclconsult.co.uk/liveablestreetswapping/

    The Liveable Streets programme is part of the Love Your Neighbourhood initiative which aims to improve the area for all by making changes to the street infrastructure. By reallocating road space to walking, cycling and public transport, the scheme will encourage changes in travel behaviour which will help to improve people’s health and well being. The scheme also aims to restrict rat running to improve the safety of residential streets.

    Over a 4-year period, 17 areas across the borough have been identified for the scheme. The image below shows the different areas and phases of the scheme. Liveable Streets Wapping is one of the schemes in the first phase of the project.

    We would like to hear what is important to you and the changes you think should be made to encourage more walking, cycling and public transport use in Wapping.

    Please sign in to vote.
  • London Assembly Transport Committee Bus network design, safety

    Created by Simon Munk // 1 thread

    London Assembly said:
    "Buses are the busiest form of public transport in London. The city has 675 bus routes, with around 9,000 buses in operation and over 19,000 bus stops. Approximately 2.5 billion bus passenger trips are made every year, around double the number made on London Underground.
    "TfL commissions private operators to run bus services in London, awarding seven-year contracts to operate bus routes. Although bus safety (in terms of casualty numbers) has improved over recent years, there was a spike in bus collision fatalities in 2015.
    "The London Assembly Transport Committee is investigating two aspects of bus services in London: Network Design and Safety."

    Please sign in to vote.
  • Tower Hamlets Local Infrastructure Fund consultation

    Created by Alex Jenkins // 1 thread

    The council is consulting on the Local Infrastructure Fund (LIF) to give local people a say in defining the infrastructure priorities for their areas.

    The consultation period will run for six weeks from 27 June 2017 to 8 August 2017.

    Tower Hamlets has grown rapidly in recent years, and a number of new housing and employment developments have been built across the borough. Additional growth is expected in the future and the council recognises that this can put pressure on local services and infrastructure - that is, on areas like transport, schools, healthcare facilities and parks/open spaces.

    To deal with the impacts, developers are required to pay a financial contribution called the Community Infrastructure Levy (CIL). The borough has apportioned to each LIF Area, 25 per cent of the money from which the income was generated. Please refer to the LIF Area Profile documents for the specific amounts collected so far for each LIF Area. The council must then use this money to support the development of the local area, by addressing the demands that development places on the area, and by making sure the right infrastructure and services are in place for residents.

    In addition to understanding local people’s infrastructure priorities, the council is engaging with local people and giving them an opportunity to nominate projects that they would like to see delivered in their neighborhood. These can be new or existing projects already identified by the council in the LIF Area Profiles. Prior to the allocation of funding to any project and in line with the regulations, you will need to clearly demonstrate how the project will deliver the provision, improvement, replacement, operation and/or maintenance of infrastructure or anything else that is concerned with addressing the demands that development places on an area.

    This consultation provides local people with an opportunity to nominate up to three (new or existing) projects. Prior to the allocation of the funding to any project and in line with the regulations it will need to be clearly demonstrated how the project will deliver the provision, improvement, replacement, operation or maintenance of infrastructure or provides anything else that is concerned with addressing the demands that development places on an area.

    Please sign in to vote.
  • Central London Cycling Grid Borough High Street/Newcomen Street junction

    Created by Simon Munk // 1 thread

    Overview
    We are seeking your views on proposed changes to the junction of Borough High Street with Union Street and Newcomen Street. The proposals are part of the Central London Cycling Grid - a network of cycle routes in Zone 1.
    This junction forms part of the Blackfriars to Tower Bridge Road route. The London Borough of Southwark consulted on other parts of this route in October 2015 – further details can be found here:
    What are we proposing?
    Our proposals aim to improve safety for cyclists and accommodate the predicted increase in cyclists along this route. The design would provide a more direct route for eastbound cyclists by removing a long detour and allowing them to proceed along Newcomen Street. By altering the signal phasing of the junction, we would also enable cyclists on Borough High Street to turn onto the new route.
    Why are we proposing this?
    The Blackfriars to Tower Bridge Road Route will provide a safer and more pleasant journey through a section of the city that is already popular among commuters as well as recreational cyclists. Transport for London and Southwark Council have identified certain junctions and sections of the proposed route that could be modified to improve cycle accessibility as well as safety for all users of the road, including pedestrians.
    By closing a short section of Newcomen Street to motor vehicles and creating two-way access to the junction, we will remove a long detour from the cycle route. Changes to signal phasing at the junction, and modifications to existing street furniture, will create safer routes for cyclists without affecting pedestrian accessibility.
    At construction stage the junction would also be resurfaced. Proposals for this junction are:
    Union Street
    Existing contra-flow cycle lane retained for cyclists travelling westbound on Union Street. This would connect to Southwark Council’s proposals for Union Street.
    Existing advanced stop line extended to 5m with a cycle feeder lane. These extended facilities would provide cyclists with a larger waiting area in front of motor traffic, improving their visibility, and allowing them to safely move away at the traffic lights.
    Borough High Street
    Dedicated low-level cycle signals to inform cyclists of when to safely proceed across Borough High Street from Union Street and Newcomen Street.
    Pedestrian islands widened to improve pedestrian accessibility across Borough High Street.
    Cyclists permitted to turn left onto Union Street and Newcomen Street. This movement is currently banned and would remain banned for other vehicles. This allows cyclists on Borough High Street to join the route. The signal phasing would be altered to permit this movement. NOTE: All vehicles (including cyclists) would continue to be banned from turning right into Union Street or Newcomen Street.
    All-round pedestrian signal phase retained so that pedestrians can safely make all movements across the junction at the same time.
    Newcomen Street
    Section of Newcomen Street closed to motorised traffic. Bollards would be installed approximately 30m west of the junction to enforce road closure to motorised traffic except for emergency access. NOTE: Newcomen Street is a borough-owned road and this aspect of the scheme would be progressed by the London Borough of Southwark.
    Two-way cycling permitted on Newcomen Street allowing cyclists travelling eastbound to proceed directly from Union Street, and turn left from Borough High Street.
    Existing footways widened to improve pedestrian accessibility.
    We have carried out traffic modelling for this proposal. The results indicate that the proposed changes can be accommodated without undue delay to any road user.

    Please sign in to vote.

19 threads found for 'london':

No planning applications found for 'london'.

Back to top