Things tagged 'tfl_consultation'

limited to the area of Southwark Cyclists:

18 issues found for 'tfl_consultation':

  • Duke Hill St/Tooley St

    Created by SallyEva // 1 thread

    Proposals include:

    Introducing a 20mph speed limit along entire length of Duke Street Hill/Tooley Street (between Borough High Street and Tower Bridge Road)
    Introducing a 2 metre wide mandatory cycle lane westbound, on Duke Street Hill/Tooley Street, running between Borough High Street and Bermondsey Street junctions, separated from traffic with wands on the Duke Street Hill section
    Introducing a protected right turn ‘pocket’ for cyclists waiting to turn right into Bermondsey Street from Tooley Street
    Making Duke Street Hill no entry, apart from cyclists and buses, from the junction with A3 Borough High Street. This will mean that eastbound traffic along Duke Street Hill and Tooley Street as far as the junction with Bermondsey Street is restricted to buses and cycles only.
    Restricting access from side roads onto Tooley Street to westbound travel only. Any motorized vehicle turning onto Tooley Street from the following roads will not be able to turn onto and travel eastbound towards Bermondsey Street:
    Tooley Street onto Duke Hill Street
    Bridge Yard onto Tooley Street
    Cottons Lane onto Tooley Street
    Hay’s Lane onto Tooley Street
    Battlebridge Lane onto Tooley Street
    Westbound traffic will continue to be able to travel along this section of highway as it does at present (i.e. accessing via Bermondsey Street or from roads further east) which lead onto Tooley Street.

    This will be an interim scheme, reducing traffic in the short term. We are working on a more transformational scheme for Tooley Street, to extend the high-quality cycling provision proposed as part of Cycle Superhighway 4 towards London Bridge.

    Please sign in to vote.
  • ASLs at Dulwich Common/Lordship Lane junction, nowt else

    Created by SallyEva // 1 thread

    This is a junction on the south circular by the (now closed) Harvester pub.

    Notoriously frightful it had no pedestrian crossings whatsoever -- just scurry across folks -- and naturally cyclists were expected to take their lumps.

    Proposal is to give pedestrians on two arms green man crossing and cyclists on all three arms ASLs. Nothing else.

    No re-configuration for cyclists, no advance release lights. For a mayor committed to clean air and active travel it is pathetic. Real un-reconstructed token-gesture TfL traffic engineering.

    Please sign in to vote.
  • closing Mina Road access to Old Kent Road

    Created by SallyEva // 2 threads

    Mina Road would be no entry, apart from cyclists, from the junction with Ivy Church Lane. This will prevent northbound traffic entering from Mina Road onto B203 Dunton Road, to prevent stopping on the hatch markings at the junction with the A2 Old Kent Road. This movement can cause congestion and a road safety risk to all users.

    Motor vehicles would not be able to use Bagshot Street and Mina Road for access onto the A2 Old Kent Road. The scheme would improve conditions and safety for local residents and cyclists. The reduced amount of traffic will create a safer environment.

    Road users who normally would use Mina Road to access the A2 Old Kent Road would need to use Bagshot Street, Albany Road and Shorncliffe Road. The parking and loading bays on the northern side section of Mina Road would remain unchanged.

    Please sign in to vote.
  • St. Thomas Street, London Bridge reopening one-way access only

    Created by Simon Munk // 1 thread

    TfL says:

    What we plan to do
    Since the street was closed there has been more emphasis on the environment and reducing pollution, creating healthier places. So we are proposing to reopen the street one-way – westbound – for access only. Access only includes private vehicles, deliveries to the premises along the street, taxis picking-up and dropping-off at The Shard (note that the station taxi drop-off and pick-up is on London Bridge St by the News building) and residents. This will keep traffic to a minimum and make the place better for people walking and people cycling.

    For people walking
    Relocate the crossing and create a coloured, raised imprint area of road surface between Weston Street and The Shard indicating to drivers and people cycling that people walking are likely to be crossing making it easier and safer for people approaching the relocated crossing
    Introduce a 10mph speed limit. By making the street 10mph we will make it safer for people walking and people cycling and improve the local environment as traffic slows, reducing noise and air pollution

    For people cycling
    Cycling would be permitted along the full length of the street with the direction of traffic

    For people using buses or coaches
    The one way nature of the street allows for the reintroducton of coaches and buses, without congestion

    For people using taxis
    • We will provide for taxis to pick-up and drop-off visitors to The Shard

    The main changes people will notice apart from the reopening and resurfacing by Network Rail will be new signs (No motor vehicles except for access) and lines marked on the street (indicating taxi ranks etc). We are keeping the works to a minimum as plans develop to meet the local aspirations for the street which will avoid any disruptive and unnecessary works.

    As a result of these proposals general traffic will no longer be able to drive onto St Thomas St eastbound from Borough High Street. Since the closure this has mainly been taxis, private hire and deliveries but there is often congestion and risks from turning vehicles. By making it one-way we can remove the delays and hold-ups caused by turning vehicles, the extra pollution they cause, and reduce the risk of vehicles colliding with people walking and cycling.

    Private vehicles, taxis, private hire, delivery and servicing vehicles, people cycling and disabled blue badge holders will be able to access St Thomas St westbound from its junction with Crucifix Lane and Bermondsey St. to access The Shard and other businesses along St Thomas St.

    Our plans form part of the Mayor of London’s plan for Healthy Streets - a long-term vision to encourage more people to walk, cycle and use public transport by making London’s streets healthier, safer and more welcoming. By providing more high quality spaces we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving. These improvements will contribute to Healthy Streets by:

    Encouraging more people to walk and, with the next phase that this is facilitating, to cycle
    Improving the public realm and contributing to the wider regeneration of the area
    We will monitor the impacts of the one-way access-only arrangements and will continue to work with Southwark Council and the local community to meet the aspirations for St. Thomas St.

    We will aim to complete the new traffic management scheme by May 2018.

    Please sign in to vote.
  • Quietway 83 (Bermondsey to Catford) Section 1

    Created by Luce // 1 thread

    First section of this QW to be consulted on, which will, in the main, mirror LCN22. One of the main reasons for this alignment is to encourage cyclists away from the Canal Path, which is at saturation at peak times, with no safe (24/7) alternative.

    Southwark's account of the changes:

    'This Quietway is planned to run from Bermondsey down to Peckham Road, running along Glengall Road, Trafalgar Avenue and Sumner Road. We hope it will provide a safe alternative cycling route to the Surrey Canal Path, as we know this can sometimes become crowded with pedestrians and cyclists.

    Changes along the proposed new Quietway include:

    widening the east-west section of the Surrey Linear Canal Path into a shared path
    installing a new two-way cycle path along Trafalgar Avenue
    changes to the junction of Sumner Road and Commercial Way
    new pedestrian and cycle crossings
    new raised tables and raised junctions
    improving or replacing many of the existing speed humps
    double yellow lines at some junctions to improve visibility and pedestrian accessibility.'

    Please sign in to vote.
  • Heavy Goods Vehicles Safety Standard Permit /Direct Vision Standard

    Created by Simon Munk // 1 thread

    Tfl says:

    We have undertaken research that shows that in 2015, Heavy Goods Vehicles (HGVs) were involved in disproportionately high numbers of fatal collisions with cyclists (78 per cent) and pedestrians (20 per cent) on London’s streets, despite only making up four per cent of the overall miles driven in the Capital. The Direct Vision Standard (DVS) forms part of The Mayor, Sadiq Khan and TfL’s Vision Zero approach to reducing road danger. The DVS categorises HGVs on the level of the driver’s direct vision from the cab.

    We consulted earlier this year on the principles of a new DVS. Listening to the feedback from this consultation and working closely with industry and stakeholders we have now further developed this scheme. The Consultation report and Responses to Issues Raised document from this first phase of consultation are available to view in from the links at the bottom of this text. The responses showed that, in general, there is support for the principle of a Direct Vision Standard.

    We are now seeking your views on proposals to introduce a new Safety Standard Permit Scheme as part of DVS which widens our approach beyond direct vision and includes a safe system approach to allow us to address a broader range of road danger risks.

    The proposed scheme would require all HGVs over 12 tonnes to hold a Safety Permit to operate in Greater London from 2020. HGVs will be given a rating between ‘zero-star’ (lowest) and ‘five-star’ (highest). Only those vehicles rated ‘one star’ and above would be allowed to enter of operate in London from 2020. Zero rated vehicles would only be allowed if they can prove compliance through safe system measures. By 2024 only ‘three-star’ rated HGVs and above would automatically be given a Safety Permit. HGVs rated two star and below would need to demonstrate increased safety through progressive safe system measures.

    The safe system could include specific industry recognised measures such as sensors, visual warnings and comprehensive driver training. The Safety Standard Permit scheme would evolve over time, taking into account advances in technology.

    Detailed information about the scheme and the approach in which we have arrived at our current proposals are set out in the consultation document. A full Integrated Impact Assessment is also included.

    The consultation approach
    We are undertaking a phased consultation approach at key stages of the development of the consultation proposals to implement the Direct Vision Standard:

    Phase 1 (24 January to 18 April 2017) – we set out the case for HGV driver direct vision and consulted on the Mayor of London’s outline proposals to introduce a Direct Vision Standard for HGVs in London and the principles of the Standard itself. The responses showed that, in general, there is support for the principle of a Direct Vision Standard.

    Phase 2a – policy consultation (this consultation) – this current phase of consultation seeks views and feedback on the scheme proposals as outlined above and within the supporting consultation document which includes supporting technical reports including the full Integrated Impact Assessment. Feedback from this phase of consultation will be used to develop a second IIA and finalise the scheme proposals to be included in phase 2b of the consultation.

    Phase 2b - Final scheme proposals and statutory consultation (Spring/Summer 2018) – this final phase will consult on the final proposals for the HGV Safety Standard Permit Scheme, including statutory consultation on the appropriate regulatory measure to ban or restrict HGVs in London under the scheme, subject to UK Government and European Commission support and notification.

    Please sign in to vote.
  • London Assembly Transport Committee Bus network design, safety

    Created by Simon Munk // 1 thread

    London Assembly said:
    "Buses are the busiest form of public transport in London. The city has 675 bus routes, with around 9,000 buses in operation and over 19,000 bus stops. Approximately 2.5 billion bus passenger trips are made every year, around double the number made on London Underground.
    "TfL commissions private operators to run bus services in London, awarding seven-year contracts to operate bus routes. Although bus safety (in terms of casualty numbers) has improved over recent years, there was a spike in bus collision fatalities in 2015.
    "The London Assembly Transport Committee is investigating two aspects of bus services in London: Network Design and Safety."

    Please sign in to vote.
  • Mayor's Transport Strategy

    Created by Simon Munk // 1 thread

    Draft Mayor's Transport Strategy 2017
    On June 21 Mayor of London, Sadiq Khan, published a draft of the Mayor's Transport Strategy. The document sets out the Mayor’s policies and proposals to reshape transport in London over the next 25 years.

    About the strategy

    Transport has the potential to shape London, from the streets Londoners live, work and spend time on, to the Tube, rail and bus services they use every day.

    By using the Healthy Streets Approach to prioritise human health and experience in planning the city, the Mayor wants to change London’s transport mix so the city works better for everyone.

    Three key themes are at the heart of the strategy.

    1. Healthy Streets and healthy people
    Creating streets and street networks that encourage walking, cycling and public transport use will reduce car dependency and the health problems it creates.

    2. A good public transport experience
    Public transport is the most efficient way for people to travel over distances that are too long to walk or cycle, and a shift from private car to public transport could dramatically reduce the number of vehicles on London’s streets.

    3. New homes and jobs
    More people than ever want to live and work in London. Planning the city around walking, cycling and public transport use will unlock growth in new areas and ensure that London grows in a way that benefits everyone.

    Please sign in to vote.
  • Cycle Superhighway Route 4 from Tower Bridge to Greenwich

    Created by Fran Graham // 3 threads

    TfL say:

    We want your views on proposals to transform roads in Bermondsey, Rotherhithe, Deptford and Greenwich to make cycling and walking easier, safer and more appealing.

    Cycle Superhighway 4 (CS4) would provide a continuous segregated cycle route between Tower Bridge and Greenwich, along with new pedestrian crossings, improved public spaces and a host of other improvements aimed at creating a more attractive environment for all users and accommodating the area’s future growth. This consultation does not include proposals for Lower Road, which will be consulted on at a later date (find out more).

    CS4 would form part of London’s expanding network of Cycle Superhighways, an important part of the Mayor’s draft Transport Strategy and Healthy Streets Approach, which aim to encourage walking, cycling and public transport, making London greener, healthier and more pleasant.

    Summary of proposed changes

    Our proposals for CS4 include:

    Two-way segregated cycle track on Tooley Street, Jamaica Road, Evelyn Street and Creek Road, providing a dedicated space for people who want to cycle
    Five new signal-controlled pedestrian crossings and upgrades to over 20 existing pedestrian crossings, making it easier and safer to cross the road
    Building on the recent short-term improvements at Rotherhithe Roundabout by redesigning the roundabout to improve safety as part of our Safer Junctions programme.
    Installing a new eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout, giving buses priority at the roundabout and improving bus access to Lower Road
    New and improved public spaces at Deptford High Street and Rotherhithe Roundabout, including new paving and trees
    New traffic restrictions, including banned turns on some side roads along Jamaica Road and at Deptford High Street
    Changes to some bus stop layouts and locations, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)

    Why are we proposing CS4?

    Around 3,500 trips are already being made daily by people cycling along the A200. In addition, this route has some of the highest numbers of pedestrian numbers in London. CS4 is designed to help us meet the target set out in the Mayor’s draft Transport Strategy of changing the way people choose to travel so that, by 2041, 80 per cent of all trips in London are made by walking, cycling or public transport, up from 64 per cent today.

    Improving safety

    Safety is one of the main barriers to cycling in London. Between September 2013 and August 2016, there were 93 recorded collisions involving cyclists and 49 recorded collisions involving pedestrians along this section of the A200. Our research shows that, were the route safer, more journeys could be made on foot or by cycle.

    CS4 would separate cyclists from motor traffic by providing kerbed cycle tracks along its length. At major junctions, cycles would be separated from motor traffic using cycling-specific traffic light phases to reduce the risk of collisions. Our proposals also include major safety improvements at Rotherhithe Roundabout, which was identified as a priority for changes as part of our Safer Junctions programme.

    Encouraging active travel in south-east London

    Cycling is now a major mode of transport in London. There are more than 670,000 cycle trips a day in the capital, an increase of over 130 per cent since 2000. The introduction of the East-West and North-South Cycle Superhighways has seen a significant increase in cycling as a mode of transport along those routes.

    An emerging network of Cycle Superhighways exists in north, south and east London, but none yet in south-east London. Our proposals would bring a high-quality cycle facility to south-east London, encouraging more people to start cycling. Our analysis shows that sections of Tooley Street and Jamaica Road are among the top one per cent of areas for cycle demand in London, while the entire CS4 route is in the top five per cent.

    Improving facilities for cycling and walking along the proposed CS4 route would not only benefit those who currently walk and cycle, but could also have a positive effect on public health by increasing the levels of physical activity in the area. Our research shows that sections of the proposed route are in the top one per cent of London’s road network for its potential to switch from vehicles to cycling as a means of transport. The majority of the route is in the top five per cent. There is also great potential to encourage people to switch from making short vehicle trips to walking.

    These proposals form part of the Mayor of London’s plan for Healthy Streets. This is a long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. Currently, only 34% of Londoners take 20 minutes of physical activity on any given day. The new cycle facilities and pedestrian improvements are designed to help encourage more people to use active and sustainable modes of transport.

    Improving places

    Our proposals would help connect Bermondsey, Rotherhithe, Deptford and Greenwich, linking important amenities and facilities, making them more pleasant places to live, work, shop and spend time. We would install new seating areas and cycle parking to provide space for people to rest and spend time in these town centres, along with other improvements such as new plants and trees. Our proposals aim to create more welcoming and inclusive streets for individuals and communities to enjoy.

    Joined-up improvements to accommodate growth

    London is growing and changing, with the city's population forecast to rise from 9 million people today to 10.5 million in 2041. We must find new ways to plan London's growth, including proposals like CS4 to encourage healthy and sustainable transport. CS4 is part of a package of planned and proposed improvements aimed at helping this part of south-east London accommodate expected growth, including the regeneration of Canada Water, recent improvements made to ease congestion at Rotherhithe Roundabout, and the proposed Rotherhithe to Canary Wharf river crossing.

    Where would CS4 go?

    The proposed route would run along Tooley Street, Jamaica Road, Evelyn Street and Creek Road, linking Bermondsey, Rotherhithe, Deptford and Greenwich.

    Lower Road

    This consultation does not include proposals for Lower Road, which will be consulted on at a later date. Lower Road is adjacent to Canada Water, an area that will see major regeneration and development in the next few years. To understand how these developments and future transport schemes would affect the existing road network, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community.

    What is proposed for CS4?

    Improvements for cycling

    New two-way segregated cycle track on the north side of Tooley Street, Jamaica Road, Evelyn Street and Creek Road replaces some bus and general traffic lanes
    Cycle track switches to the south side at the junction with Southwark Park Road to bypass Rotherhithe Roundabout
    Proposals for the Lower Road section to be consulted on at a later date
    Cyclists bypass traffic light controlled junctions at Abbey Street and Deptford Church Street
    Cyclists are separately controlled by signals at all other junctions
    Connection to proposed cycling Quietway 14 at Tanner Street (find out more about Tanner Street)
    Road design and layout

    Some general traffic lane replaced by new two-way segregated cycle track Redesigned and improved geometry of Rotherhithe Roundabout to encourage better lane discipline and assist all through movements
    Left turn lane on Jamaica Road extended to reduce queueing time for buses and local traffic trying to access Brunel Road
    Removal of some central reservation on Jamaica Road to accommodate new cycling facilities
    Mini-roundabout replaces signalised junction at Oxestalls Road
    Removal of centre line markings on some sections of Evelyn Street to improve road safety
    Making Shad Thames one-way northbound to improve the performance of the junction and reduce pedestrian wait times
    Banning the left turn from Jamaica Road into Bevington Street to provide a continuous eastbound bus lane and improve bus journeys
    Making Cathy Street one-way northbound to remove through-traffic from residential roads, while allowing a new right turn into Cathay Street from Jamaica Road to improve local access
    Making Marigold Street exit-only on to Jamaica Road to improve safety for all road users
    Banning the right turn into Evelyn Street from Watergate Street and Deptford High Street, and banning the right turn into Deptford High Street from Evelyn Street
    Change to buses

    Some bus lane replaced by new two-way segregated cycle track on Jamaica Road, Evelyn Street and Creek Road
    New eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout to prioritise bus access to Lower Road
    Changes to bus stop locations along Evelyn Street
    Changes to some bus stop layouts, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)
    Improvements for walking

    Five new signal-controlled pedestrian crossings, including three along Jamaica Road
    Upgrades to existing pedestrian crossings including simpler 8-metre wide crossing outside Bermondsey Station
    6-metre wide toucan crossing (for pedestrians and cyclists) outside Deptford Park Primary school
    6-metre wide pedestrian crossing on desire line opposite Deptford High Street
    Pedestrian crossing on the eastern arm of the Norway Street / Creek Road junction moved to the western arm and widened to 6 metres.
    Pedestrian crossing time saving of over 1 minute expected outside Bermondsey Station and at the Jamaica Road junction with Tanner Street

    Predicted impacts of our proposals

    We are proposing major changes to the road layout to make cycling and walking easier, safer and more appealing. We have considered all road users throughout the design process so as not to have a disproportionate impact on any one group. This section summarises the impacts we predict our proposals to have on different road users.

    General traffic and bus journey times
    The reallocation of road space is expected to change some journey times and traffic movements. We have carried out traffic modelling to predict how the proposals might affect journey times and traffic movement through the area affected by the scheme. A summary of this analysis is available below:

    We would actively monitor and manage traffic conditions following delivery of the scheme. We are investing in advanced traffic signal technology to allow us to better manage traffic depending on differing conditions at any given time, and we are working to improve road user information so people can make informed journey choices before they travel.

    Parking and loading
    Our proposals for CS4 include changes to the layouts of some of the parking and loading bays along the route. Double yellow lines (no parking at any time) would also replace single yellow lines along some sections of Evelyn Street and Creek Road.

    During the consultation period, we will contact premises we think could be affected by these changes. If you think the proposals could affect you or your business, please contact us to let us know (contact details are at the bottom of this page). We encourage you to discuss these proposals with your suppliers.

    Environment
    Our proposals aim to improve the quality of life in the area by:

    Reducing the dominance of motor traffic, allowing people to better enjoy the area
    Improving pedestrian crossings and cycle facilities, to encourage more people to walk and cycle through the area
    Protecting bus journey times to safeguard public transport as a mode of choice
    Although not a traffic-generating scheme, our proposals would change how traffic moves around the area, which may result in some associated and localised changes in air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.

    Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we are consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).

    A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five Low Emission Neighbourhoods, and expanding the electric vehicle charging network and making it simpler to use.

    We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Read more about how we are creating Healthy Streets

    Equalities

    How we fulfil our obligations under the Equality Act 2010
    We are subject to the general public sector equality duty set out in Section 149 of the Equality Act 2010, which requires us to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations by reference to people with protected characteristics. The protected characteristics are: age, disability, gender reassignment, marriage and civil partnership, pregnancy and maternity, race, religion or belief, sex and sexual orientation. As part of our decision-making process on the proposals for Cycle Superhighways, we have had due regard to any impacts on those with protected characteristics and the need to ensure that their interests are taken into account.

    In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, such as Cycle Superhighways, we:

    Complete Equality Impact Assessments (EQIAs) at the outset of the project, to review potential impacts on equality target groups, including disabled people
    Carry out public consultations, including targeted engagement with specific users such as (among many others): Royal National Institute of Blind People, Guide Dogs, Age UK, Transport for All, and National Autistic Society
    Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
    The EQIA completed for CS4 shows positive impacts for black and ethnic minority groups, females, disabled cyclists, and cyclists under 25 and over 65 years of age. Positive impacts have also been identified for disabled pedestrians, as the scheme involves a number of improvements to pedestrian facilities, including wider footways and new and improved crossings. Some negative impacts have been identified where footways are cut back or shared-use footway is introduced. However, the minimum 2-metre standard for footway widths has been maintained to allow two wheelchair users to pass safely. Kerb-protected cycle facilities, which lead to positive impacts for people with protected characteristics when they are cycling, work most effectively when they feature bus stop bypasses. Bus stop bypasses and their impacts are described below.

    Bus stop bypasses
    At bus stop bypasses, the cycle track continues behind the bus stop at carriageway level, providing continuous segregation from motor traffic for people cycling. Bus passengers access a waiting area by crossing the cycle track using a raised, marked crossing point. The waiting area would be at least 2.5 metres wide. Pedestrians would cross the cycle track at raised, marked crossing points to continue their journey.

    Our research has found that bus stop bypasses are safe for all road users, including bus passengers. Routing cycle traffic away from the road is an effective way to create safe, attractive cycling facilities along bus routes. The risk of conflict between cycles and pedestrians has been found to be very low, while providing a dedicated crossing point for bus passengers and design features that encourage slower cycling help to make the bus stop area more comfortable for everyone to use.

    Bus stop bypasses are used across Europe and there are a number of examples in operation or planned across the UK, including in Brighton, Cambridge and Manchester, as well as in London. We introduced some bus stop bypasses on the Cycle Superhighway 2 (CS2) extension between Bow and Stratford in Autumn 2013 and across other Cycle Superhighways in 2015-16.

    We are continuing to engage with accessibility and cycling groups and carry out additional research into the type and layout of pedestrian crossings at bus stop bypasses. We have a dedicated working group overseeing on-street trialling of the use of zebra crossings over cycle tracks at bus stop bypasses. This group includes representatives from Transport for All, the Royal National Institute of Blind People, Guide Dogs, Age UK London, London TravelWatch, Cycling Embassy of Great Britain, Living Streets, the London Cycling Campaign and Cycling UK. We will incorporate findings of these further investigations, including the outcomes of discussions about the trial with the working group, into final proposals for CS4.

    Find out more about bus stop bypasses

    Tactile paving
    We would use tactile paving on all crossings and traffic islands throughout CS4. Along the route, tactile paving would be designed according to Department for Transport guidance. Local standards would apply in the London Borough of Lewisham and the Royal Borough of Greenwich.

    Accessibility for cyclists with disabilities
    CS4 would be suitable for use by disabled cyclists using adapted cycles, such as hand cycles and tricycles. The designs adhere to the principles for inclusive cycling set out in our London Cycling Design Standards. Cycle tracks on CS4 would be as wide as possible and a smooth riding surface would be provided, with the entire cycle route to be resurfaced.

    Next steps

    We will analyse and consider all of the responses received to the consultation, and expect to publish our response early in 2018.

    For the Lower Road section, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark to understand how developments and future transport schemes would affect the existing road network. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community. Consultation on proposals for Lower Road will take place at a later date

    Subject to the outcome of consultation and agreeing proposals with partner boroughs, we would aim to commence construction on CS4 in late 2018. We would plan construction carefully to minimise disruption to those who live, work and travel through the areas.

    As part of this planning, we would coordinate closely with other construction works in the area, and consider alternative ways of working including advance works, weekends and evenings. We would also carry out an extensive communications and engagement campaign to ensure residents, businesses and others travelling through the works areas have the information they need to plan ahead and adapt their travel arrangements where necessary, reducing any impact on their journeys during the construction period.

    Please sign in to vote.
  • Camberwell Green junction

    Created by Elizabeth E. // 1 thread

    TfL are making changes to junction because of safety issues.

    For Cyclists:

    Two-stage right turns at the junction in the west to south and east to north directions
    An early release at the traffic lights on all four arms of the junction
    Deeper Advanced Stop Lines (ASLs)
    Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
    St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
    Resurfacing throughout the junction.
    Retention of the 20mph speed limit at the junction and on all the approaches.

    Please sign in to vote.
  • Waterloo roundabout

    Created by Simon Munk // 1 thread

    We want your views on proposals to help inform our LCC response.

    TfL says:

    Overview:
    We want your views on our proposals to create a better Waterloo. We’ve developed these proposals over the past 10 years by working with local stakeholders and the community. The original vision can be found here. Our proposals aim to create a healthier and safer environment for people to walk and cycle and use public transport as well as support the regeneration and growth of Waterloo. These proposals aim to improve the quality of life in the area by:
    Reducing the dominance of traffic, allowing people to better enjoy the area
    Creating a healthier and safer environment
    Planting more trees to replace the removal of trees which will have the potential to benefit biodiversity, landscaping and wildlife
    Creating a sense of place with the proposed new public square
    Creating a focal point for Waterloo, helping build on it as a cultural destination and support the regeneration and growth of Waterloo
    Keeping buses and traffic moving through the area.
    The proposals form part of the Mayor of London’s plan for Healthy Streets - a long-term vision to encourage more Londoners to walk and cycle and use public transport by making London’s streets healthier, safer and more welcoming.

    What we are proposing

    Our proposals would:
    Create a new tree-filled public square supporting civic and cultural life of the area by moving the existing bus stops from Tenison Way to an improved bus station on Waterloo Road, closing the south-west arm of the roundabout and changing the remaining carriageway to two-way traffic
    Introduce segregated cycle lanes making cycling around Waterloo roundabout safer
    Create new pedestrian routes and permanently remove some subways (but keep others) to help create more direct walking routes towards the river Thames. The subways can be unpleasant and divisive, inaccessible to large sections of the community
    Widen the footways on Waterloo Road to give more space to pedestrians and waiting bus passengers by narrowing the carriageway through removing a section of bus lane
    Relocate northbound and southbound bus stops to keep traffic moving on Waterloo Road
    Ban the right turns from Waterloo Road into Stamford Street and from Concert Hall Approach (except for buses) to keep traffic moving.

    Why We Are Consulting

    Encourage more walking and cycling and use of buses by
    Making it easier, safer and more pleasant
    Keeping buses and traffic moving through the area
    Provide a sense of place and improve the environment by
    Creating a new, high-quality, traffic-free, green public space to become a focal point for Waterloo supporting the civic and cultural life of the area
    Support the regeneration and growth of Waterloo
    Currently the area is overcrowded and difficult to navigate for pedestrians, bus passengers and cyclists. This is exacerbated by street clutter and level differences that make it confusing and harder for people to get to where they want to go.
    It will get even busier because of major planned developments, including increasing capacity at Waterloo station. The roundabout is dominated by motor traffic and can be intimidating and unpleasant to walk and cycle.
    By giving cyclists more space and time to pass through the area more easily, and by providing new signalised crossings, a new public space and wider footways for pedestrians and waiting bus passengers, we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving.
    Waterloo is a very important transport hub with Europe’s busiest rail station, a strategic bus interchange, and large numbers of cyclists and some key cycle routes passing through it.
    It is also home to international visitor and cultural attractions, workplaces, residents and academic institutions.
    Our proposals are designed to improve safety for vulnerable road users by introducing dedicated facilities, such as signalised pedestrian crossings, new cycle lanes and separate cycle signals. Waterloo roundabout is one of 33 locations across London we are prioritising as part of our Safer Junctions programme.
    Overall, these proposals are designed to make it easier, safer and more attractive to walk, cycle and use public transport in the area, and to prepare for and stimulate further growth and regeneration.

    Potential effects of our proposals

    Journey times
    We expect the proposals would result in changes, both positive and negative, to journey times for motorists, bus passengers and cyclists once complete. Click here for the information (PDF) that explains the impacts we expect our proposals to have on journey times and is accompanied by a more detailed table of data.

    Walking
    We want to make walking more convenient and attractive. There are a number of places where overcrowding is common such as Tenison Way and Waterloo Road:
    The proposed new public space would provide lots more room for pedestrians and create a key focal point in the local area with crossings relocated to where people want to cross
    Wider and clearer footways would reduce overcrowding on Waterloo Road
    Walking routes would be opened up, improving way finding and permeability.

    Cycling
    Taken from survey data in 2013 cyclists make-up 40% of traffic around Waterloo roundabout in the AM peak.
    We want to make cycling in Waterloo easier, safer and more attractive. Our proposals provide dedicated time and space for cyclists and aim to reduce road casualties by addressing the patterns of past collisions:
    Segregated cycle lanes around the new peninsula. The impact of this is balanced with bus and general traffic movements by making some strutural changes to the roundabout
    Separate cycle signals on traffic lights would reduce the number of conflicts with general traffic
    Existing cycle parking stands would be relocated
    The cycle hire docking station outside Kings College would be relocated
    We are working with other teams delivering projects that would provide better and safer connections to existing and planned cycle routes.

    Bus passengers
    Waterloo is a strategic part of the London bus network, with some of its busiest routes serving the area, used by 20,000 passengers a day. Our proposals aim to encourage more people onto buses and keep all traffic moving:
    An improved bus station and new public square would provide a much improved interchange and waiting environment for bus passengers
    Wider footways on Waterloo Road would provide a larger and safer area for waiting bus passengers and accommodate future growth in numbers
    Bus stops would be relocated from Tenison Way to the improved bus station on Waterloo Road and the northbound and southbound bus stops on Waterloo Road would be consolidated.
    A short section of bus lane on Waterloo Road would be removed to keep traffic moving.

    General traffic
    We want to reduce the dominance of traffic around Waterloo by creating an environment which encourages people to walk, cycle or use public transport. As a result:
    There would be some changes to general traffic journey times as a result of these proposals. We would remove the south-western side of the roundabout to create the new public space. Traffic would flow two-way around the new peninsula
    The section of northbound bus lane on Waterloo Road from the junction with The Cut would be removed to provide more space for pedestrians. Buses would share the general traffic lane and pull-in to the relocated bus stops allowing traffic to pass
    The right turn from Waterloo Road into Stamford Street and the right turn from Concert Hall Approach (except for buses) would be banned to keep traffic moving through the area.
    We do not develop proposals to introduce traffic restrictions without carefully considering the potential impacts and exploring alternative solutions. The restrictions are proposed to either address a safety issue, or help the signalised junction operate more efficiently and minimise potential journey time delays to road users.

    Deliveries and servicing
    Some changes to existing servicing arrangements may be required. If your home or workplace is on or near the proposed changes, please let us know if the proposals could affect your deliveries, collections and servicing. We would encourage you to discuss the proposals with companies undertaking these operations.

    Taxis
    The main taxi rank is on Station Approach and is not affected by these proposals.

    Rail and London Underground users
    Network Rail has a programme of works to increase capacity at Waterloo Station and London Underground has plans to increase Bakerloo and Northern Line services, increasing the numbers of people using Waterloo to interchange. Our proposals would make it easier and more attractive for passengers to continue their journeys on foot, cycle or bus.

    Environment
    Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we have been consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).
    A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five ‘Low Emission Neighbourhoods’ and expanding the electric vehicle charging network, as well as making it simpler to use. We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Click here for more information on how we are creating Healthy Streets and click here for the draft Mayor's Transport Strategy. Our proposals aim to improve the quality of life in the area by:

    Reducing the dominance of traffic, allowing people to better enjoy the area
    Exploring opportunities to achieve more greening
    Creating a sense of place with the proposed new public square and providing additional seating.
    As our proposals for Waterloo would change how traffic moves around the area, we expect there would be some associated and localised changes to air quality and noise levels. We will be carrying-out environmental surveys and environmental modelling to help our design development.

    Security barriers on Waterloo Bridge
    The Metropolitan Police Service has installed barriers to increase security on London’s busiest bridges. Our proposals will aim to ensure that the security of all road users is maintained in the future.

    Working with the local community
    TfL has been working with Lambeth Council and engaging with businesses, local stakeholders and the Mayor to develop these proposals over the years. These are the planning documents and guidance consulted on with the local community that have helped us develop these proposals:
    A local college, Morley College, has produced a photo record to capture the sense of place and character of the area that these proposals will build on. These photos will be on show at the public events and around Waterloo.
    There is a public art poem by the poet Sue Hubbard called “Eurydice” on the wall of one the subways we propose to remove. The poem was written as part of the renovation of the South Bank especially for the underpass that leads from Victory Arch at Waterloo Station to the BFI IMAX cinema. We will work with local stakeholders to investigate how we can include the poem in the new public space.

    Next steps
    Subject to the outcome of this consultation, should we proceed with these proposals, we would look to start construction in late 2019 for a period of up to 18 months.
    We are aware that there is a lot of construction occurring in the Waterloo area and these changes are likely to cause further disruption. We would work with the local community, Lambeth Council, SBEG, WeAreWaterloo and surrounding developers to coordinate works and deliveries to minimise this impact as far as possible.

    Previous consultations
    As part of the Mayor’s Better Junctions Review we made improvements at the roundabout to reduce accidents by providing more priority and road space for cyclists, particularly at the junctions with Stamford Street and Waterloo Road.
    Later the speed limit was reduced to 20mph and will be retained under these proposals.

    Please sign in to vote.
  • Left turns from bidirectional North-South CSH

    Created by Bruce Lynn // 1 thread

    Problem with bidirectional paths is making left turns across the traffic. For North-South Cycle Superhighway TfL proposed a small waiting area with protective island (see illustration from Consultation document). They built one island and found cars going wrong way round it, so removed the island. So left turns waiting bays now have only white paint (see photos at http://healthyrider.weebly.com/miscellaneous.html). Very intimidating when traffic is heading towards you from the opposite motor traffic lane!
    I understand TfL is "working on a solution". But does anyone have ideas we could feed to TfL. Does anyone know of an example where an "offside" left turn has been well engineered?

    Please sign in to vote.
  • Junction of A100 Tower Bridge Road and Tanner Street

    Created by Simon Munk // 1 thread

    TfL Overview
    In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.

    What are we proposing?
    The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
    Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.

    The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
    1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
    2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
    3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
    4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
    5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
    6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
    7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
    8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
    9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
    10 New position of relocated loading bay from Tanner Street (see 9)
    11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
    12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.

    Please sign in to vote.
  • Central London Cycling Grid Borough High Street/Newcomen Street junction

    Created by Simon Munk // 1 thread

    Overview
    We are seeking your views on proposed changes to the junction of Borough High Street with Union Street and Newcomen Street. The proposals are part of the Central London Cycling Grid - a network of cycle routes in Zone 1.
    This junction forms part of the Blackfriars to Tower Bridge Road route. The London Borough of Southwark consulted on other parts of this route in October 2015 – further details can be found here:
    What are we proposing?
    Our proposals aim to improve safety for cyclists and accommodate the predicted increase in cyclists along this route. The design would provide a more direct route for eastbound cyclists by removing a long detour and allowing them to proceed along Newcomen Street. By altering the signal phasing of the junction, we would also enable cyclists on Borough High Street to turn onto the new route.
    Why are we proposing this?
    The Blackfriars to Tower Bridge Road Route will provide a safer and more pleasant journey through a section of the city that is already popular among commuters as well as recreational cyclists. Transport for London and Southwark Council have identified certain junctions and sections of the proposed route that could be modified to improve cycle accessibility as well as safety for all users of the road, including pedestrians.
    By closing a short section of Newcomen Street to motor vehicles and creating two-way access to the junction, we will remove a long detour from the cycle route. Changes to signal phasing at the junction, and modifications to existing street furniture, will create safer routes for cyclists without affecting pedestrian accessibility.
    At construction stage the junction would also be resurfaced. Proposals for this junction are:
    Union Street
    Existing contra-flow cycle lane retained for cyclists travelling westbound on Union Street. This would connect to Southwark Council’s proposals for Union Street.
    Existing advanced stop line extended to 5m with a cycle feeder lane. These extended facilities would provide cyclists with a larger waiting area in front of motor traffic, improving their visibility, and allowing them to safely move away at the traffic lights.
    Borough High Street
    Dedicated low-level cycle signals to inform cyclists of when to safely proceed across Borough High Street from Union Street and Newcomen Street.
    Pedestrian islands widened to improve pedestrian accessibility across Borough High Street.
    Cyclists permitted to turn left onto Union Street and Newcomen Street. This movement is currently banned and would remain banned for other vehicles. This allows cyclists on Borough High Street to join the route. The signal phasing would be altered to permit this movement. NOTE: All vehicles (including cyclists) would continue to be banned from turning right into Union Street or Newcomen Street.
    All-round pedestrian signal phase retained so that pedestrians can safely make all movements across the junction at the same time.
    Newcomen Street
    Section of Newcomen Street closed to motorised traffic. Bollards would be installed approximately 30m west of the junction to enforce road closure to motorised traffic except for emergency access. NOTE: Newcomen Street is a borough-owned road and this aspect of the scheme would be progressed by the London Borough of Southwark.
    Two-way cycling permitted on Newcomen Street allowing cyclists travelling eastbound to proceed directly from Union Street, and turn left from Borough High Street.
    Existing footways widened to improve pedestrian accessibility.
    We have carried out traffic modelling for this proposal. The results indicate that the proposed changes can be accommodated without undue delay to any road user.

    Please sign in to vote.

110 threads found for 'tfl_consultation':

No library items found for 'tfl_consultation'.

No planning applications found for 'tfl_consultation'.

Back to top