Things tagged 'quietway-7'

limited to the area of Southwark Cyclists:

3 issues found for 'quietway-7':

  • Dulwich Village Quietway 7 monitoring

    Created by SallyEva // 1 thread

    council wants feedback to the newly implemented Dulwich Village road layout as part of its Quietway monitoring and evaluation plan. Is this any better than what was there before? previous adaptions for cycling on other junctions have not been subject to this "monitoring and evaluation".

    Please sign in to vote.
  • partial filter on Champion Hill to improve Q7

    Created by SallyEva // 1 thread

    council says:
    traffic surveys show that most of the traffic on Champion Hill is through traffic, avoiding Grove Park, Champion Park and Denmark Hill, particularly north-bound in the morning peak. The trial is intended therefore to restrict the morning through traffic, travelling westwards/northwards through Champion Hill to Denmark Hill, so that the area is safer and more pleasant for walking and cycling creating Healthy Streets for everyone in Champion Hill. We believe this will also reduce traffic dominance on Grove Hill Road around Dog Kennel Hill school.

    From a cycling POV this will improve safety on Q7 in the evenings.
    Experimental traffic order 6-12mths

    Please sign in to vote.
  • Dulwich Wood Park Speed Reduction

    Created by Gipsy Hill // 1 thread

    Rushed consultion to on A2199 (SRN) Dulwich Wood Park serving two bus routes and LCN23 (connects with Quietway 7).

    Main Issue: the Dual Carriage is not being removed. The downhill "Speed reduction" measure is to reduce downhill part of the Dual Carriage to 3.2m working for a long section. Cyclists are expected to take the primary position on this steep downhill (10% hill at top) mixed with heavy traffic, and somehow slow all traffic behind them to then navigate the ~120 degree left turn into Farquhar Road. The road has severe AM peak time traffic. Cyclists are expected to weave around traffic in this long 3.2m downhill section.

    Consultation is sham and is considered unfair . The feedback form does not allow uses to clearly "support" or "object" to all, or each of the planned interventions. So is more like a statuary consultation than a fair assessment of options.

    There is major resurfacing due in a few months at his location, and the changes and detailed designs are being rushed to meet this deadline.

    Please list your concerns below

    Consultation Hub:
    https://consultations.southwark.gov.uk/environment-leisure/dulwich-wood-park-speed-reduction/

    A (Proposed raised zebra) - crossing Raising the existing crossing near St Margaret Clitherow Church and converting this to a zebra crossing.

    B (Existing island to be widened) - Widening the existing crossing point between Wickes Oake and Lymer Ave

    C (Provide 2.0m stepped) cycle track) - Segregating the existing cycle lane on the northern side of the junction with Farquhar Road, narrow the road and provide additional cycle lanes on the southern side.

    D (Existing island to be reconstructed to accommodate 3.2m lane width) - Raising an existing crossing point and removing one existing crossing point, between Farquhar Road and Wickes Oake.
    D (Proposed raised junction treatment) - Raising the junction at junction with Farquhar Road.
    D (Proposed raised table) - Providing a raised table near the junction with Baird

    Please sign in to vote.

3 threads found for 'quietway-7':

No library items found for 'quietway-7'.

No planning applications found for 'quietway-7'.

Back to top